1300 589 579info@itfactory.com.au3 Allen Place, Wetherill Park
Office relocation & closure

The office is empty. Is every retired IT asset accounted for?

Relocating, consolidating or closing an office? IT Factory identifies retired equipment, destroys data-bearing devices and documents the final outcome.

IT asset technicians recording retired laptops and desktops during an office relocation
Relocation breach risks

Common data breach risks during an office relocation.

Temporary storage, multiple suppliers and rushed handovers can weaken the controls normally applied to data-bearing equipment.

Exposure

Devices left unattended

Laptops, drives and removable media can be left in open rooms, loading areas or unsecured crates while teams move between sites.

Tracking

Assets lost between locations

Multiple movers, contractors and internal teams can create gaps in the asset list, making it difficult to confirm where every data-bearing device ended up.

Handover

Unclear custody handovers

If collection and transfer points are not recorded, responsibility can become unclear while equipment is transported, stored or passed to another supplier.

Disposal

The wrong retirement pathway

Data-bearing equipment can be sent for reuse, resale or general e-waste processing before its data has been securely erased or physically destroyed.

Two relocation outcomes

An empty office does not always mean the retirement project is closed.

Physical completion

The office is cleared

Equipment is collected, but there is no complete record of which data-bearing assets were reused, destroyed or recycled.

The premises are cleared. Asset accountability remains open.
Controlled completion

The office is cleared, and the assets are accounted for

Retired equipment is recorded, directed to an approved pathway and checked against the agreed asset list.

The organisation retains a clear final record.

Both scenarios may result in an empty office. Only the second demonstrates controlled asset retirement.

How IT Factory helps

Turn your office relocation into a controlled IT asset retirement project.

We help organisations close the gap between technical project completion and lifecycle accountability.

Service details, capture requirements and the available evidence are confirmed during project scoping.

  1. 1

    Confirm the scope and assets

    Agree on locations, equipment types, volumes, custody requirements and the approved retirement list.

  2. 2

    Choose the service model

    Select on-site destruction where witnessing or custody requirements favour processing at the premises, or controlled off-site processing where collection is appropriate.

  3. 3

    Process and reconcile

    Capture the agreed identifiers and check completed processing against the original asset list.

  4. 4

    Document project closure

    Provide the agreed certificates, destruction records, reconciliation and exception reporting.

Project evidence

More than an equipment collection receipt.

A properly scoped evidence package can connect the approved release decision to the final treatment outcome.

Project evidence

What destruction records should show

Good project records should make it easy to confirm what was approved, what was processed and whether anything remains unresolved.

  • Client, site and project reference
  • Device or media identifiers agreed for capture
  • Destruction method, date and processing location
  • Completed results checked against the release list
  • Any missing items, changes or exceptions recorded
  • Certificate of Destruction and final project summary

The exact records supplied depend on the evidence requirements agreed before work begins.

Example IT Factory Certificate of Destruction and supporting project record
Destruction options

On-site or off-site

We confirm the most appropriate pathway during project scoping.

At your premises

On-site destruction

Best when destruction must be completed or witnessed at your workplace.

Controlled collection

Off-site destruction

Best when secure collection and documented processing suit the project.

Project enquiry

Discuss your office relocation project

Provide the equipment type, estimated quantity, location and preferred service model. We will confirm the practical scope, required records and timing.

Scope, availability, pricing and timing are confirmed separately in writing.